transmission break over!
... Unfortunately my laptop for some time that had knocked out.
In the meantime, has done a lot on the site:
The floor has been laid; introduced the screed. Meanwhile, the floor is also due to the heating (2200 kWh (!)) Dried - is residual moisture at 0.2%. The tile back on in the week after next, so that we are on schedule as well. The interior plaster is so far - the subject is a tiresome as I various Blogs could see. We have now a good result - Smoothing on Q3 - super finish. A wallpaper would not like us here, so that only this option left (we were advised by the popular painter fleece - wg of plastic in the house.). Unfortunately, FH offer us not, because we are not about the price (charge - my word of the year, followed by encouragement variants) could agree.
Next week can follow the bathtub and shower trays - so slow it is really our home.
Geothermal energy is also now connected with the solar system, we produced the first kWh. In the calculation, however, are also back € 2,500 Uncalculated costs incorporated (Delivery shaft for the two holes). These costs are unfortunately not mentioned in the calculation or in the sampling. There should be but experience from the various construction projects.
If I succeed, I will now devote myself to the garden map of FH. Let's see what I get for proposals (Snowy is provided by the family as a gardener!). We have a rectangular plot of land - not just for planning.
0 comments:
Post a Comment