interior bathroom
Today there was a problem: Our bathroom installations
is not supplied by FH - the tiles already. It must happen, of course, that which is unavoidable during construction.
The installer has ordered all the parts, FH busy with those tiles.
Our construction manager has been solved well - FH comes a little later on the site and our bathroom is still easily done.
The electrical installation is not yet entirely complete - it still lacks a connecting cable - then the door bell attached.
The transfer of the heat pump is also still - this will take at least felt a 1 / 2 day. To optimize the settings is at then. Right now my power consumption is too high (about 1.5 € / day).
Next steps: let make allowance for the kitchen and order the food.