Air Duct Mold Spore Count

The interior work begins ...

As we install the spotlights, I must be slow because gas and search for the right spots - now I've found (from Rutec).

Hint: Be sure to take so-called Coolfit light source - the radiation a high percentage of the heat in the room and not in the ceiling (as is all wood and foil!).

If I manage to write some lines on the subject utilities and their notion of work (not necessarily positive because resonates).
however: The often-maligned pink giant has done in our house very good work - good construction management and on-time work during installation.

Middle School Dance Team Noisemakers

addendum to the house the sun always shines

advance a note: Picasa and I are somehow at war - I do not get any pictures uploaded to the blog.

The House statement was really a pleasure. It
give los clock at 6:00 on our site. The column (4 persons) was about 6:10 ready for use. At 6:40 clock already was our kitchen wall. Around 9:00 clock already the ground floor was completed. Then, the internal walls were made. After a short break we went to the floor. Here, too, only the exterior walls were made and then the interior walls.
began the afternoon the column with the roof installation - we've got a hip roof, could not be made of prefabricated parts. Craft was in demand - and towards the evening the roof was addressed. On the roof we could do without, as the sun and the weather was good with us. Only sunshine, a balmy spring evening and more sunny days and left it in the announcement of us sleep in peace.
was on the second day, the Roof made rain-proof and started the interior work. I found interesting was the preparation of the walls - exterior walls were all the preparation (e-cable, etc.) and the inner walls are then prepared in the preparation.
evening was the conversation with the supervisor - very informed, very competent. He and the entire team (including truck drivers) of FH and the first contacts with the craftsmen selected by FH finally confirmed the picture that we had from FH.
is certainly now the odd dig deeper still - but the mood is positive now.
was the third day then roofed the house, the solar roof is integrated into the roof.
evening it was then the topping - With the target award by the column (the proper room's hat!). A successful completion of the indicative days - well, not quite. The column was then a fourth day and is in the following week again came to our house for 2 days (there were thus 6-day columns). In parallel, there was contact with the installers (electricity and water).