On 23 it was about time we had our handover meeting with the Construction Manager in Harsefeld.
We have gone through the drawings again just to have shutters and windows counted. Was not so refreshing and so now, to be honest ... But now we have somehow ne newer heat pump. This means for us that we have no outside module as well. That's positive views. Then we briefly our construction manager, met Mr. B.. Has again called for the company as for the GSA. We could still beat out a penny and have therefore accepted the offer of Viebrock. In the other farmers I had real depth a little abdominal pain, especially since I am still waiting for the offers (since now 1 month!! Incredible)

A week later, so this Wednesday, we had the Abstecktermin with Mr. B.. Dad was a stroke of luck with and has also been noticed that he pocketed the bars too far forward. Unfortunately, he quite, on the first drawing, which we had approved, the building window was drawn incorrectly. Now comes the house 2 feet in front of more than thought. Well. It's getting to be that good. I do not know if you can see at all was: (red-white is the house, the roof slats marking the pit)



And of course the construction sign! As said a Girlfriend is so beautiful: the quasi the squad. She's right :-)

Mr. B. said then that starts about a week before the start of construction of the excavator with the earthworks. That would be already in about 2 1 / 2 weeks. It's getting exciting.

Otherwise we could not clarify a few questions. The time was a very informative and good conversation. I believe we can be satisfied with our construction manager :-)