This time the site inspection by Partnerbau. So construction water and site electricity Providing control once the planum of the low-maker and measured. Then there is
start early next week with the preparation and on Wednesday with the pouring of the floor plate.
Again, it appears that (whether Internet thanks) asked a little Thinking is - power line guides in the garden / garage must be registered with Partnerbau a MSH is to get the media guide and must be discussed. A determination of drainage systems in the garage (which is now bricked it) should keep the green roof in front of the stagnation.
wait Now I just waiting for the execution plans of FH for signature - then get the concrete mixer.